Amity solved assignment for Production & Operations

Production & Operations Management

Q-1 (a) Define production operations management. What are its objectives and functions?

Q1 (b) What are the operations management strategies?
Q-2 (a) Explain the concept of product design and development?
Q2 (b) What are the various production systems?

Q. 3 (a) what is capacity planning? Explain the various methods of altering capacity?
Q3. (b) What are the factors affecting facility location? What are the techniques for facility location?
Q3(c)What are the various facility layouts? Enumerate the advantages and disadvantages.
Q.4. (a) what is meant by master production schedule?
Q4(b) Explain the activities involved in production planning and control.
Q4(c) Discuss MRP. What are the inputs and outputs of an MRP system?
Q.5. (a) Explain JIT manufacturing:
Q5(b)Explain acceptance sampling
Q5 (c)What do you understand by maintenance policy? Explain various categories of spares.
Q1a) what is economic order quantity? What arethe assumptions of EOQ?

Q1b) If the annual demand for a product is 3, 50,000 units. The annual carrying unit to purchase, and each time the product is ordered the related ordering cost

(i) What is EOQ?
(ii)What is total cost at EOQ?
(iii)How much would be the total cost if the order quantity is 2500 units due to standard packing
Q.2. a) Operations scheduling is one of the most important function of production planning and control. Discuss

Q.2.b) Solve problem using Johnson’s rule:

(i) Working Sequence using Johnson’s rule: -
(ii) Making Span: -
(iii) Slack Time (Idle Time): -
Q3 (b) Five jobs are to be assigned to five machinists. The following matrix shows the time taken by each of the machinist for each of the jobs.

Case Study: -

I. Draw the network diagram; find out the critical path and the expected duration of the project
ii) Slack time for each of the activities:
(iii) Calculate the probability of completing the project in 30 days

1. Organizations that produce something other than physical products are called
a) Transformation organizations
b) Data transfer groups
c) Service organizations
d) Cultural organizations

2. Which of the following is NOT a characteristic of service operations?
a) Intangible output
b) Perishable products
c) Labour intensive
d) Low customer contact

3. Decisions thatltend to focus on the entire organization, cutting across
a) Departmental
b) Tactical
c) Strategic
d) Routine

4. Competing ondifferentiationis
a) Concerned with uniqueness
b) Based on cost leadership
c) Based on flexibility
d) Reliability of scheduling

5. Which of the following is NOT important in globalization?
a) Product design
b) Culture and ethics
c) Facility location
d) Facility lay out

6. Which of the following conditions are NOT generally associated with job process?
a) Work force with highly specialized skills
b) Low product volume
c) Relatively high customization
d) High resource flexibility

7. Low volume, high variety production is best suited for
a) Process focus
b) Repetitive focus
c) Product focus
d) Mass customization

8. Which of the following automatically place parts into a warehouse
a) ASRS
b) AGV
c) FMS
d) SGV
9. The planning and scheduling of production only against specific production order is
a) Make-to-Stock
b) Make to-Order
c) Assemble-to-Order
d) Mass Customization

10. Which of the following is NOT a characteristic during the introductory phase of the product life cycle?
a) Research
b) Process modification
c) Supplier development
d) Capacity utilization

11. Which of the following is a characteristic of the maturity phase?
a) Products are ʹline tunedʺ
b) Product designs begin to stabilize
c) Competitors are well-established
d) Products are considered for termination

12. Benefits of design for manufacturability and value engineering include all of the following accept
a) Reduced complexity of the product
b) Additional standardization of the components
c) Improved job design and safety
d) Compromise quality

13. Modular design
a) Offers flexibility to both production and marketing
b) Means that small variations in production do not adversely affect the product

c) Uses computers to interactively design the products
d) Are environmentally friendly

14. Which of the following is NOT a concept of green manufacturing?
a) Make products recyclable
b) Standardization of components
c) Use less harmful ingredients
d) Use lighter components

15. Design effectiveness is NOT measured by
a) Percentage of standard parts & processes
b) Number of revisions in the design

c) Cost offieldrepairs
d) Time taken from concept to market

16. Which of the following is NOT a benefit of concurrent engineering?
a) Enables early supplier involvement
b) Promotes consensus decision making
c) Reduces developmental lead-time
d) Eliminates design changes after product introduction

17. Which of the following is NOT a method for evaluating location alternatives,
a) The transportation model
b) Factor rating
c) Centre of gravity method

18. Which of the following is NOT a mathematical technique used for finding the

point that services several stores or areas
a) Factor rating .
b) Centerof gravity
c) Transportation model
d) Hungarian method

19. The system that has the highest equipment flexibility is
a) Job shop
b) Batch
c) Repetitive production
d) Continuous processing

20. In a product layout the process of deciding how to assign tasks to work stations is referred to as:
a) Process balancing
b) Task allocation
c) Line balancing
d) Factor rating

21. The advantages NOT associatedwitha U shaped assembly line overa straight one are
a) Fewer workers are needed
b) Workers can reach more of the work area
c) Work area can be efficiently balanced
d) Automated material handling

22. All of the following statements about using the transportation model to

true EXCEPT
a) The least expensive alternatives often are those in which the output is produced and sold in the same period

b) It is possible to disallow backorders by making the back-order cost an impossibly high number
c) The transportation model is less useful for chase strategies
d) A periodʹsovertime capacity is generally a percentage of its regular time capacity

23. Which of the following statements about a linear programming model is NOT true
a) An optimal production planis desired
b) The values of decision variables are fractional
c) A set of linear constraints might be defined
d) Cross-product relationships exist between two or more decision variables

24. The limitations that restrict the permissible choices for decision variables are called
a) Parameters
b) Objective function
c) Decision variables
d) Constraints

25. The total cost for a continuous review system with uncertain demand excludes consideration of
a) Cycle inventory holding cost
b) Product cost
c) Ordering cost
d) Safety stock holding cost

26. Select the characteristic that is not indicative of a job shop environment
a) Low to medium volume production

b) Job or batch processes
c) Consistent, sequential process flow
d) Continual introduction of new jobs to be processed

27. The priority -sequencing rule for job shop scheduling that relies ieast on time based data is
a) Critical ratio
b) Earliest due date
c) First come, first served d) shortest processing time

28. Which statement about capacity requirements planning (CRP) is not true -
a) CRP systems adjust the order release time to prevent a workstation for exceeding its capacity?
b) CRP systems access inventory records to determine when planned

c) CRP systems enable the identification of critical workstations
d) The purpose if CRP is to match the material requirements plan with the plant’s production capacity

29. Materials handling includes all of the following activities except a) Moving an assembly
b) Drilling a hole
c) Storing a product d) Handling materials

30. The work measurement method that is not usually used for setting standards for repetitive, well defined jobs is
a) The elemental standard data approach
b) The work sampling method
c) The time study method

d) The predetermined data approach

31. Attribute inspection measures
a) The range of a characteristic
b) If product responsiveness is adequate
c) If cause and effect are present
d) If the product is good or bad

32. One hundred percent Inspection

a) Will always catch all of the defective parts

b) Means that only good parts will be shipped to the customer
c) Is always practical and generally a good idea
d) Means that every part is checked to see whether or not it is defective

33. Process capability

a) Means that the natural variation of the process must be small enough to produce products that meet the standards
b) Exists when Cpk is less than 1

c) Exists when the process is perfectly centered
d) Cannot be measured

34. The R-chart

a) Is used to measure changes in the central tendency
b) Is always in control if the X-bar chart is in control
c) Generally uses control limits set at plus or minus 2 standard deviations of the distribution, rather than plus or minus 3 which is commonly used on the X-bar chart
d) Is used to indicate gains or losses in uniformity

35. A customer service hotline has received an average of7 complaints adayforthelast25

chart should be used to monitor this hotline
a) C-chart
b) P-chart
c) X-bar chart
d) no-chart

36. The maximum output of a system in a given period is called the
a) Break-even point

b) Design capacity
c) Effective capacity
d) Efficiency

37. Methods analysis focuses on
a) The design of the machines used to perform a task
b) Howa task is accomplished
c) The raw materials that are consumed in performing a task
d) Reducing the number of steps required to perform a task

38. Which of the following doesn’t relate to work scheduled?
a) Flex time
b) Flexible
c) Work week
d) Part time system
e) Ergonomics

39. A good maintenance facility should have on the following except
a) Well train personnel
b) Availability to identify the cause of break down
c) Availability to extend MTBF
d) Availability to increase MTTR

40. The process that is intended to find potential failure and make change or repair is known as
a) Break down maintenance
b) Failure maintenance
c) Preventive maintenance
d) Reactive maintenance

Dear Student,

solved assignment which is always available with us. We ensure you that the answer quality would be the best and you will get up to 90% to 100% marks in the assignments purchased from us. We have an expert on every subject working with us. The subject matter experts are highly qualified and deliver their best for you over and over again.

Please have a look at the price list mentioned below and send us a reply on this e-mail to let us know which assignment you want from us.

                 

Type A- Rs. per subject – This assignment is ready to use assignment for every student. (The content of this assignment is the same for every student. You may risk getting your marks deducted by the university due to plagiarism.)

Type B- Rs.  per subject - This assignment is personalized and customized just for you. The answers of this assignment would not be shared with any other student. The content of this assignment would be unique and we will delete it from our database after sending it to you exclusively. (This assignment would have 0% plagiarism)

Type C- Rs. per subject – This assignment is done by our staff members on your behalf. We will do it online by using your e-mail id and password. The answers we provide would be unique and will not be shared with any other student. (This assignment would also have 0% plagiarism)

Please note that you have to pay us in advance. All payment should be made in INR. As soon as we receive your payment, we will send your Type A assignment within 10 minutes only. If you have opted for Type B, we will send the assignment within 5 hours of receiving your payment. If you have opted for Type C, we will send your assignment within 24 hours of receiving the payment. Type B and Type C assignment submission takes more time because we customize each and every word of the assignment just for you. So we request you to be patient.

 

 Our process

1.        Email or call us for which of assignment you need A,B,C

2.        we will reply you price list of assignment

3.        After you have made the payment please email us your payment details with Assignment Name and Type Preference at solvezone@gmail.com. We will send your assignment asap.

Pay Online

Now you can also make the payment online by the below mentioned link. We accept payments through Credit Card, Debit Card and Net Banking too.

Click Here To Make Payment

Pay Offline

You can also pay us via NEFT / RTGS by visiting the nearest branch of your bank.

You can also deposit Cash by visiting the nearest branch of ICICI Bank.

 

University:  AMITY Year:  2015
Subject: 
Amity solved assignment for Production & Operations