amity solved assignment for software engineering

Discuss the differences in the following:

 

 1.

 

(a) Top-down and bottom-up

 

(b) Black box and white box testing

 

 

What do you mean by software maintenance? Explain the maintenance tools in details in details.

 

Explain why a design with low coupling helps maintainability

4

What is software design? Discuss the design principles in detail.

5

Explain on the following:

 

(a)    Problem partitioning

 

(b)   Abstraction

 

What do you understand by software project scheduling? Write down the software project scheduling techniques

Write short note

 

(a)    Software Cost Estimation

 

(b)   Team Structure

 

Answer any five of the questions below.

 

What do you understand by the term Software Development Life Cycle? Why is it important to adhere to a life cycle model while developing a large software system? 

 

Q. Read the case study given below and answer the question given therein

Case Study 

Consider a program for determining the previous date. Its input is a triple of day, month and year with the values in the range

1 ≤ month ≤ 12

1 ≤ day ≤ 31

1900 ≤ year ≤ 2025

 

Assignment C

 

Question No: 1

83241

In Waterfall model user involvement is in--

 

   

All phases

Some phases

Not involved

None

 
   

Question No: 2

83242

In Planning we include--

   

What is to be done

How is to be done

By whom is to be done

None

 
   

Question No: 3

83243

Which SDLC includes Risk?

   

Spiral model

Waterfall model

Iterative model

None

 
   

Question No: 4

83244

Design type are--

   

Conceptual design

Technical design

Both

none of the above

 
   

Question No: 5

83245

Answer all questions.                                                                              

 Tick mark (√) the most appropriate answer

Two basic issues for software engineering are--

 

   

Engineering-design

Hardware-software

Software quality-cost

None

 
   

Question No: 6

83246

Costliest phase of software development is--

 

   

Testing

Coding

Analyzing

None

 
   

Question No: 7

83247

An example of an expert system is--

   

The internist

A stock and bond analyze

Structural analyze

None

 
   

Question No: 8

83248

A virtual interface that--

   

Is easy for programmer

Is similar to doing traditional computer programming

Does not allow user to take shortcuts

None

 
   

Question No: 9

83249

The screen displays produced by a prototyping software package--

 

   

Are the output produced by complete system program

May closely model the output that may produced by system program

Discourage user

None

 
   

Question No: 10

83250

The following is not normally used during System Design--

 

   

Program review

Working prototype

Standard manual

None of the above

 
   

Question No: 11

83251

Approach used in top-down analyzes and design--

   

Identify a top- level function and then create a hierarchy of lower level modules and component

To prepare flowchart.

All

None of the above

 
   

Question No: 12

83252

During the data gathering phase of system analysis--

   

Problem flowchart are often prepared

System design specification are outlined

Number of specialized forms may be prepared

None

 
   

Question No: 13

83253

First step of implementation phase is--

 

   

Select computer

Implementation planning

Prepare physical facilities

None

 
   

Question No: 14

83254

A programmer would most likely prepare a

   

General system flowchart

Specific system flowchart

General program flowchart

Specific program flowchart

 
   

Question No: 15

83255

Implementation of  project proposal is prepared by--

   

The executive vice-president and manager

Vice president of information system

System analyst guidance of vice-president of information system

None

 
   

Question No: 16

83256

Design specification does not normally include--

   

Output requirement

Input requirement

Control provision

None

 
   

Question No: 17

83257

Some firms have created a combination position called--

   

Analyst/manager

Manager/operator

Analyst/programmer

None of above

 
   

Question No: 18

83258

During the system study, vice-president and manager do the--

 

   

Planning

Directing

Controlling

None of above

 
   

Question No: 19

83259

In token count N=N1+N2, where N1 is--

   

Unique operator

Unique operand

Occurrence of operator

None

 
   

Question No: 20

83260

Features of function point are--

   

Average ,low, high

Average

High

None

 
   

Question No: 21

83261

In function point function units are--:

 

   

5

4

6

3

 
   

Question No: 22

83262

Risk management is of --------- types.

   

List of potential risk

Prioritized list of risk

Risk avoidance

Risk assessment

 
   

Question No: 23

83263

Organic COCOMO model have range of-

   

0-50 kloc

50-300 kloc

Over 300 kloc

None

 
   

Question No: 24

83264

Which one is not user documentation?             

   

Beginner’s guide

Installation guide

SRS

None

 
   

Question No: 25

83265

AMC stands for--

   

Annual maintenance cost

Annual manage effort

Development effort

None of above

 
   

Question No: 26

83266

In Token count total length is equal to--

 

   

n= n1+n2

n2= n1+n3

n=n1/n2

none

 
   

Question No: 27

83267

Average Staff is calculated on the basis of--

   

Effort

Development

Effort/development

None

 
   

Question No: 28

83268

Risk Analysis means--

 

   

Evaluate probability

Probability ranges

Both

None of these

 
   

Question No: 29

83269

Software Engineering means--

   

Making software

Manufacturing software

Developing software

None

 
   

Question No: 30

83270

Software is easy to change, this statement is--

   

True

Myth

Hypothetical

None of above

 
   

Question No: 31

83271

Which one is maintenance model?

   

CMM

Quick fix model

Iterative model

None

 
   

Question No: 32

83272

In which model fixes are done without detailed analyses of the long term effects?

   

Reuse enhancement model

Quick- fix model

Taute model

None of the above

 
   

Question No: 33

83273

Iterative enhancement model  has--

   

3 stages

6 stages

4 stages

None of the above

 
   

Question No: 34

83274

Taute maintenance model has--

   

2 phase

4 phases

5phasea

10 phases

 
   

Question No: 35

83275

In Bohem model ,ACT stands for--

   

Actual change time

Annual change time

Actual change traffic

Annual change time

 
   

Question No: 36

83276

Regression testing is known as--

 

   

The process of retesting the modified parts of software

Process of testing the design document

Review the SRS

None of these

 
   

Question No: 37

83277

Regression testing is related to--

   

Maintenance of software

Development of software

Both

None

 
   

Question No: 38

83278

Legacy system is--       

   

Old system

New system

Undeveloped

None of the above

 
   

Question No: 39

83279

User Documentation consist of--

   

Beginner’s guide

Installation guide

Reference guide

None of the above

 
   

Question No: 40

83280

Which one is not user documentation?  

   

Beginner’s guide

Installation guide

SRS

None

 

 

Amity solved assignment.

 

Dear Student,

 

Solved assignment which is always available with us. We ensure you that the answer quality would be the best and you will get up to 90% to 100% marks in the assignments purchased from us. We have an expert on every subject working with us. The subject matter experts are highly qualified and deliver their best for you over and over again.

Please have a look at the price list mentioned below and send us a reply on this e-mail to let us know which assignment you want from us.

  • Ready to use General Assignments – This assignment is ready to use assignment for every student. (The content of this assignment is the same for every student. You may risk getting your marks deducted by the university due to plagiarism.) We will provide you with all Sections of assignment fully solved: Section A, Section B, Section C.
  • Customized, personal and exclusive Assignments- This assignment is personalized and customized just for you. The answers of this assignment would not be shared with any other student. The content of this assignment would be unique and we will delete it from our database after sending it to you exclusively. (This assignment would have 0% plagiarism). We will provide you with all Sections of assignment fully solved: Section A, Section B, Section C.
  • Answers with online typing and filling assistance Assignments – This assignment is done by our staff members on your behalf. We will do it online by using your Amity user id and password. The answers we provide would be unique and will not be shared with any other student. (This assignment would also have 0% plagiarism) .We will provide you with all Sections of assignment fully solved: Section A, Section B, Section C. Please NOTE:  This assignment is same as Customized, personal and exclusive Assignments, in addition we provide you here online typing and filling by just an additional charge of Rs 300 only as typing charge.

Please note that you have to pay us in advance. All payment should be made in INR. As soon as we receive your payment, we will send you’re ready to use General Assignment within 10 minutes only. If you have opted for Customized, personal and exclusive Assignment, we will send the assignment within 5 hours of receiving your payment. If you have opted for Answers with online typing and filling assistance Assignment, we will send your assignment within 24 hours of receiving the payment. Customized , personal and exclusive Assignments and Answers with online typing and filling assistance Assignments  submission takes more time because we customize each and every word of the assignment just for you. So we request you to be patient.

 Our process

 

  • Email or call us for which type of assignment you need: Ready to use General Assignments OR Customized, personal and exclusive Assignments OR Answers with online typing and filling assistance Assignments
  • We will reply you with price list of assignment
  • After you have made the payment please email us your payment details with Assignment Name and Type Preference at solvezone@gmail.com. We will send your assignment ASAP.

Pay Online

Now you can also make the payment online by the below mentioned link. We accept payments through Credit Card, Debit Card and Net Banking too.

http://solvezone.in/payments

Pay Offline

You can also pay us via NEFT / RTGS by visiting the nearest branch of your bank.

You can also deposit Cash by visiting the nearest branch of ICICI Bank.

 

  M.No. 08882309876 M.No. 08010058890 E-mail solvezone@gmail.com

 

  1. Please email us your details with your contact number so that we can contact you.
  2. Now you can  also enquire with our instant enquiry section at the bottom of the page
Year:  2015
Subject: 
software engineering