Year: 2015Discuss the differences in the following:
1.
(a) Top-down and bottom-up
(b) Black box and white box testing
2
What do you mean by software maintenance? Explain the maintenance tools in details in details.
3
Explain why a design with low coupling helps maintainability
4
What is software design? Discuss the design principles in detail.
5
Explain on the following:
(a) Problem partitioning
(b) Abstraction
6
What do you understand by software project scheduling? Write down the software project scheduling techniques
7
Write short note
(a) Software Cost Estimation
(b) Team Structure
8
Answer any five of the questions below.
What do you understand by the term Software Development Life Cycle? Why is it important to adhere to a life cycle model while developing a large software system?
Q. Read the case study given below and answer the question given therein
Case Study
Consider a program for determining the previous date. Its input is a triple of day, month and year with the values in the range
1 ≤ month ≤ 12
1 ≤ day ≤ 31
1900 ≤ year ≤ 2025
Assignment C
Question No: 1
83241
In Waterfall model user involvement is in--
All phases
Some phases
Not involved
None
Question No: 2
83242
In Planning we include--
What is to be done
How is to be done
By whom is to be done
None
Question No: 3
83243
Which SDLC includes Risk?
Spiral model
Waterfall model
Iterative model
None
Question No: 4
83244
Design type are--
Conceptual design
Technical design
Both
none of the above
Question No: 5
83245
Answer all questions.
Tick mark (√) the most appropriate answer
Two basic issues for software engineering are--
Engineering-design
Hardware-software
Software quality-cost
None
Question No: 6
83246
Costliest phase of software development is--
Testing
Coding
Analyzing
None
Question No: 7
83247
An example of an expert system is--
The internist
A stock and bond analyze
Structural analyze
None
Question No: 8
83248
A virtual interface that--
Is easy for programmer
Is similar to doing traditional computer programming
Does not allow user to take shortcuts
None
Question No: 9
83249
The screen displays produced by a prototyping software package--
Are the output produced by complete system program
May closely model the output that may produced by system program
Discourage user
None
Question No: 10
83250
The following is not normally used during System Design--
Program review
Working prototype
Standard manual
None of the above
Question No: 11
83251
Approach used in top-down analyzes and design--
Identify a top- level function and then create a hierarchy of lower level modules and component
To prepare flowchart.
All
None of the above
Question No: 12
83252
During the data gathering phase of system analysis--
Problem flowchart are often prepared
System design specification are outlined
Number of specialized forms may be prepared
None
Question No: 13
83253
First step of implementation phase is--
Select computer
Implementation planning
Prepare physical facilities
None
Question No: 14
83254
A programmer would most likely prepare a
General system flowchart
Specific system flowchart
General program flowchart
Specific program flowchart
Question No: 15
83255
Implementation of project proposal is prepared by--
The executive vice-president and manager
Vice president of information system
System analyst guidance of vice-president of information system
None
Question No: 16
83256
Design specification does not normally include--
Output requirement
Input requirement
Control provision
None
Question No: 17
83257
Some firms have created a combination position called--
Analyst/manager
Manager/operator
Analyst/programmer
None of above
Question No: 18
83258
During the system study, vice-president and manager do the--
Planning
Directing
Controlling
None of above
Question No: 19
83259
In token count N=N1+N2, where N1 is--
Unique operator
Unique operand
Occurrence of operator
None
Question No: 20
83260
Features of function point are--
Average ,low, high
Average
High
None
Question No: 21
83261
In function point function units are--:
5
4
6
3
Question No: 22
83262
Risk management is of --------- types.
List of potential risk
Prioritized list of risk
Risk avoidance
Risk assessment
Question No: 23
83263
Organic COCOMO model have range of-
0-50 kloc
50-300 kloc
Over 300 kloc
None
Question No: 24
83264
Which one is not user documentation?
Beginner’s guide
Installation guide
SRS
None
Question No: 25
83265
AMC stands for--
Annual maintenance cost
Annual manage effort
Development effort
None of above
Question No: 26
83266
In Token count total length is equal to--
n= n1+n2
n2= n1+n3
n=n1/n2
none
Question No: 27
83267
Average Staff is calculated on the basis of--
Effort
Development
Effort/development
None
Question No: 28
83268
Risk Analysis means--
Evaluate probability
Probability ranges
Both
None of these
Question No: 29
83269
Software Engineering means--
Making software
Manufacturing software
Developing software
None
Question No: 30
83270
Software is easy to change, this statement is--
True
Myth
Hypothetical
None of above
Question No: 31
83271
Which one is maintenance model?
CMM
Quick fix model
Iterative model
None
Question No: 32
83272
In which model fixes are done without detailed analyses of the long term effects?
Reuse enhancement model
Quick- fix model
Taute model
None of the above
Question No: 33
83273
Iterative enhancement model has--
3 stages
6 stages
4 stages
None of the above
Question No: 34
83274
Taute maintenance model has--
2 phase
4 phases
5phasea
10 phases
Question No: 35
83275
In Bohem model ,ACT stands for--
Actual change time
Annual change time
Actual change traffic
Annual change time
Question No: 36
83276
Regression testing is known as--
The process of retesting the modified parts of software
Process of testing the design document
Review the SRS
None of these
Question No: 37
83277
Regression testing is related to--
Maintenance of software
Development of software
Both
None
Question No: 38
83278
Legacy system is--
Old system
New system
Undeveloped
None of the above
Question No: 39
83279
User Documentation consist of--
Beginner’s guide
Installation guide
Reference guide
None of the above
Question No: 40
83280
Which one is not user documentation?
Beginner’s guide
Installation guide
SRS
None
Amity solved assignment.
Dear Student,
Solved assignment which is always available with us. We ensure you that the answer quality would be the best and you will get up to 90% to 100% marks in the assignments purchased from us. We have an expert on every subject working with us. The subject matter experts are highly qualified and deliver their best for you over and over again.
Please have a look at the price list mentioned below and send us a reply on this e-mail to let us know which assignment you want from us.
- Ready to use General Assignments – This assignment is ready to use assignment for every student. (The content of this assignment is the same for every student. You may risk getting your marks deducted by the university due to plagiarism.) We will provide you with all Sections of assignment fully solved: Section A, Section B, Section C.
- Customized, personal and exclusive Assignments- This assignment is personalized and customized just for you. The answers of this assignment would not be shared with any other student. The content of this assignment would be unique and we will delete it from our database after sending it to you exclusively. (This assignment would have 0% plagiarism). We will provide you with all Sections of assignment fully solved: Section A, Section B, Section C.
- Answers with online typing and filling assistance Assignments – This assignment is done by our staff members on your behalf. We will do it online by using your Amity user id and password. The answers we provide would be unique and will not be shared with any other student. (This assignment would also have 0% plagiarism) .We will provide you with all Sections of assignment fully solved: Section A, Section B, Section C. Please NOTE: This assignment is same as Customized, personal and exclusive Assignments, in addition we provide you here online typing and filling by just an additional charge of Rs 300 only as typing charge.
Please note that you have to pay us in advance. All payment should be made in INR. As soon as we receive your payment, we will send you’re ready to use General Assignment within 10 minutes only. If you have opted for Customized, personal and exclusive Assignment, we will send the assignment within 5 hours of receiving your payment. If you have opted for Answers with online typing and filling assistance Assignment, we will send your assignment within 24 hours of receiving the payment. Customized , personal and exclusive Assignments and Answers with online typing and filling assistance Assignments submission takes more time because we customize each and every word of the assignment just for you. So we request you to be patient.
Our process
- Email or call us for which type of assignment you need: Ready to use General Assignments OR Customized, personal and exclusive Assignments OR Answers with online typing and filling assistance Assignments
- We will reply you with price list of assignment
- After you have made the payment please email us your payment details with Assignment Name and Type Preference at solvezone@gmail.com. We will send your assignment ASAP.
Pay Online
Now you can also make the payment online by the below mentioned link. We accept payments through Credit Card, Debit Card and Net Banking too.
Pay Offline
You can also pay us via NEFT / RTGS by visiting the nearest branch of your bank.
You can also deposit Cash by visiting the nearest branch of ICICI Bank.
M.No. 08882309876 M.No. 08010058890 E-mail solvezone@gmail.com
- Please email us your details with your contact number so that we can contact you.
- Now you can also enquire with our instant enquiry section at the bottom of the page
Phone:+91-88823 09876